• THE CENTRAL ATRIUM SPACE - Frontline Offices - SPOL Architects
    THE CENTRAL ATRIUM SPACE   1/7
  • OFFICE SPACE FACING STRANDEN - Frontline Offices - SPOL Architects
    OFFICE SPACE FACING STRANDEN   2/7
  • CELL OFFICE WALL WITH ACOUSTIC CEILING - Frontline Offices - SPOL Architects
    CELL OFFICE WALL WITH ACOUSTIC CEILING   3/7
  • OFFICE SPACE FACING ATRIUM - Frontline Offices - SPOL Architects
    OFFICE SPACE FACING ATRIUM   4/7
  • BRIDGE ACROSS THE ATRIUM - Frontline Offices - SPOL Architects
    BRIDGE ACROSS THE ATRIUM   5/7
  • OFFICE SPACE TO LET - Frontline Offices - SPOL Architects
    OFFICE SPACE TO LET   6/7
  • OFFICE SPACE LET OUT - Frontline Offices - SPOL Architects
    OFFICE SPACE LET OUT   7/7

Frontline Offices

Towards the light

In the step by step refurbishment of the 5th floor of Aker Brygge Shipyards, the aim was to make efficient use of the space as well as logical divisions between office areas for Frontline and attractive office spaces to let out. At the same time the project had to adapt to both the existing building fabric and interior design solutions from different decades, so that as little as possible needed to be demolished and rebuilt.

Both the plan and the design emphasises on bringing the view and daylight from the atrium and the facades as far into the building as possible, thereby creating airy and comfortable work spaces for adapted to the densely populated office environments, typical for the shipping industry, where one needs to work closely together.

SHARE

DETAILS

Location

Oslo, Norway

Programme

Transformation of one office floor in former industrial building at Aker Brygge.

Area

1 900 m2

Status

Completed 2019

Team

Jens Noach, Adam Kurdahl, Tiago Sjøblom Tavares, Naofumi Namba, Elise Gaare Ytterstad, Julia Lacombe, Petter Habostad

Contractor

Lohne & Lauritzsen AS

Electrics

KM Elektro

Ventilation

Ing. S.D. Baastad

Sanitary

Flush VVS

Category
Office, Re-use, Interior
Tags
1