• MASTERPLAN MODEL - Aker Shipyard Workshops - SPOL Architects
    MASTERPLAN MODEL   1/26
  • MASTERPLAN STAR - Aker Shipyard Workshops - SPOL Architects
    MASTERPLAN STAR   2/26
  • MASTERPLAN LOCATION - Aker Shipyard Workshops - SPOL Architects
    MASTERPLAN LOCATION   3/26
  • SEAFRONT - Aker Shipyard Workshops - SPOL Architects
    SEAFRONT   4/26
  • SHIPYARD - Aker Shipyard Workshops - SPOL Architects
    SHIPYARD   5/26
  • SUBTRACTION - Aker Shipyard Workshops - SPOL Architects
    SUBTRACTION   6/26
  • ACTIVATE STREETS - Aker Shipyard Workshops - SPOL Architects
    ACTIVATE STREETS   7/26
  • REPROGRAMME - Aker Shipyard Workshops - SPOL Architects
    REPROGRAMME   8/26
  • HIGH STREET RETAIL - Aker Shipyard Workshops - SPOL Architects
    HIGH STREET RETAIL   9/26
  • OLIVIA - Aker Shipyard Workshops - SPOL Architects
    OLIVIA   10/26
  • CLEAN CUT MODEL - Aker Shipyard Workshops - SPOL Architects
    CLEAN CUT MODEL   11/26
  • MATCHING STREET LEVEL - Aker Shipyard Workshops - SPOL Architects
    MATCHING STREET LEVEL   12/26
  • CLEAN CUT CEILING - Aker Shipyard Workshops - SPOL Architects
    CLEAN CUT CEILING   13/26
  • CLEAN CUT ENTRANCE - Aker Shipyard Workshops - SPOL Architects
    CLEAN CUT ENTRANCE   14/26
  • CLEAN CUT SHOPPING - Aker Shipyard Workshops - SPOL Architects
    CLEAN CUT SHOPPING   15/26
  • CLEAN CUT DETAILS - Aker Shipyard Workshops - SPOL Architects
    CLEAN CUT DETAILS   16/26
  • PUBLIC WCS - Aker Shipyard Workshops - SPOL Architects
    PUBLIC WCS   17/26
  • OFFICE LOBBIES - Aker Shipyard Workshops - SPOL Architects
    OFFICE LOBBIES   18/26
  • OFFICE LOBBIES - Aker Shipyard Workshops - SPOL Architects
    OFFICE LOBBIES   19/26
  • ATRIUM TOP - Aker Shipyard Workshops - SPOL Architects
    ATRIUM TOP   21/26
  • OFFICE CONCEPT - Aker Shipyard Workshops - SPOL Architects
    OFFICE CONCEPT   22/26
  • OFFICE CONCEPT - Aker Shipyard Workshops - SPOL Architects
    OFFICE CONCEPT   23/26
  • OFFICE NPRO - Aker Shipyard Workshops - SPOL Architects
    OFFICE NPRO   24/26
  • GRUNDINGEN - Aker Shipyard Workshops - SPOL Architects
    GRUNDINGEN   25/26
  • HOLMENS GATE  - Aker Shipyard Workshops - SPOL Architects
    HOLMENS GATE   26/26

Aker Shipyard Workshops

Aker’s Mechanical was the first construction project as part of the Aker Brygge Masterplan. Originally built by Aker’s Mechanical Industries in Oslo in the middle of the 19th century as production facilities for maritime diesel engines, the buildings underwent major changes in the 1940s, 80s and early 2000s in the conversion to shopping mall and office building. The large volumes were filled with floor slabs to the point where hardly any spatial qualities remained, and numerous alterations, including the incorporation of a theatre with stage tower, resulted in a bespoke and chaotic structure.

The series of reconstructions, façade alterations and added exterior elements gradually erased the building’s original character. The office spaces were inflexible and the retail areas did not attract enough customers as an introvert mall unrelated to the surrounding streets.

The new project reorganized the program, pushing the shopping to the ground level and exteriorizing the shops and corporate lobbies in order to activate the streets. The building renovation focused on 6 main elements:

  • Meeting the street, including major works to the ground floor of the building to make internal levels correspond to street levels.
  • The existing façade, which is freed from all the add-on elements from the 1980’s, returned to its pure form and articulation, and remodelled to maximize the connection between retail, restaurants and the adjacent streets.
  • The voids that are created by subtracting elements from the existing structure, generating a porous mass reinstating some of the spatial qualities of the original building in retail-, restaurant- and office areas.
  • Bridging the atrium, and thus connecting the floor plates across the entire building allowing for a more efficient use of the deep floor plates by distributing programme according to access to daylight.
  • The Corporate lobbies representing the offices on street level with their own addresses, and thus activating and applying a corporate character to the side streets.
  • The Clean Cut is a new internal shopping street, a trajectory through three buildings as one arm in the Aker Brygge Star as envisaged in the new Aker Brygge Masterplan.

The building’s exterior was cleaned up; extension and front elements were removed, windows on lower levels given new and sleek steel profiles, sills under windows cut away so that the building can contribute to an active street environment. The project was developed in close dialogue with the Local Heritage Authorities.

Retail and restaurants fills the ground floor new double height spaces created by the removal of floor slabs along the building perimeter. Major structural work was undertaken to both raise and lower the internal floor levels to meet street levels. A new internal shopping street cuts through the building, as part of a new clean cut connection also running through the adjacent buildings, which linking the square in front of the City Hall to Aker Brygge’s main internal plaza.

The offices were reorganized to bridge the former longitudinal atrium, so that the space could be utilized better in terms of flexibility in size and maximizing the potential of the deep floor plate, reorganizing functions based on access to daylight. Floor height is low, and slabs were removed to give variation in heights, a quality rarely found in modern offices. The office lobbies were moved from their previous shopping mall location to the streets, giving the side streets a corporate identity, differentiated from the restaurant promenade at the water side and the shopping street to the rear of the buildings.

The new Aker’s Mechanical has attracted quality tenants in finance, retail and the restaurant industry, and has become a new up-market location for offices, shopping and eating in Oslo.

SHARE

DETAILS

Publications

Glass & Fasade 2-2014

Location

Aker Brygge, Oslo, Norway

Area

25 000 m2

Programme

Complete renovation of industrial building of historic value: retail, restaurants and offices

Status

Completed 2014

Budget

Approx. 550 mill. NOK construction value ex. shops and restaurants

Design

Space Group / Ghilardi & Hellsten

Partner in Charge

Gary Bates

Project manager

Jens Noach

Team

Space Group Team: Gary Bates, Gro Bonesmo, Adam Kurdahl, Jens Noach, Inês Almeida, Gesine Gummi, José Hernandez, Thomas Bang Jespersen, Claudia Laarmann, Svetlana Muromkaya, Naofumi Namba, Jens Niehues, Anna Nilsson, Anne Wodstrup, Kristian Grostad, Haakon Walderhaug, Jan Martin Klauza /Ghilardi+Hellsten Team: Franco Ghilardi, Ellen Hellsten, Erik Stenmann, Espen Krogstad

Graphic design

Bleed

Structure

Multiconsult

Mechanical

AJL, Erichsen & Horgen

Mechanical

AJL, Erichsen & Horgen

Electrical

Foyn Consult, ECT

Acoustic

Brekke & Strand

Fire

Multiconsult

Cost analysis

Byggeanalyse

Construction management

Vedal Prosjekt

Visualizations

Space Group/Eve Images

Category
Office, Retail, Re-use, Interior